Hot Dip Galvanizing Furnace
Created with Pixso. 420-Ton Zinc Capacity | Natural Gas Straight-Line Hot-Dip Galvanizing Production Line | Large-Scale Steel Component Batch Galvanizing & Surface Treatment System

420-Ton Zinc Capacity | Natural Gas Straight-Line Hot-Dip Galvanizing Production Line | Large-Scale Steel Component Batch Galvanizing & Surface Treatment System

Brand Name: WONDERY
MOQ: 1SET
Price: TO BE NEGOTIATED
Delivery Time: 3-5 WORKING DAYS
Payment Terms: L/C, D/P, T/T, Western Union
Detail Information
Place of Origin:
CHINA
Certification:
CE
Zinc Pot Internal Dimensions:
13×1.5×3.5 M
Zinc Capacity:
420 Tons
Gas Inlet Pressure:
100-200 KPa
Fluxing Liquid Temperature:
50 – 70℃
Packaging Details:
PALLET
Supply Ability:
1000 SETS PER MONTH
Highlight:

420-ton zinc capacity galvanizing furnace

,

natural gas hot-dip galvanizing line

,

large-scale steel component galvanizing system

Product Description

1. Product Overview

This natural gas straight-line hot-dip galvanizing production line features a zinc kettle with internal dimensions of 13m×1.5m×3.5m, 420-ton zinc capacity, and maximum hourly capacity of 18 tons/hour. The line covers the full process of pre-treatment (pickling, rinsing, fluxing), galvanizing, cooling, passivation, and exhaust gas treatment. It uses natural gas micro-positive pressure heating and incorporates a cascade flue gas waste heat utilization system (including patented technologies: combustion air heating, fluxing liquid heating, workpiece drying, sludge drying, and kettle edge waste heat recovery). It is suitable for high-volume, environmentally compliant hot-dip galvanizing of large steel structural parts.

2. Industry Challenges & Root Cause Analysis

High natural gas consumption and operating costs:Large-scale galvanizing lines consume enormous natural gas – significant operating cost pressure. Root cause: flue gas waste heat directly discharged without cascade recovery.

Acid mist and zinc fume pollution:Large pickling tanks and zinc kettles generate substantial acid mist and zinc-containing dust – severe environmental compliance pressure. Root cause: lack of enclosed negative-pressure pickling rooms and efficient bag filter + water curtain deodorization systems.

Difficult fluxing liquid iron content control:Iron ion accumulation in fluxing liquid affects coating quality and increases zinc consumption. Root cause: lack of online iron removal and automatic pH balance systems.

Galvanizing process relies on manual operation:Large-part immersion time and temperature controlled manually – inconsistent coating thickness and higher costs. Root cause: lack of PLC automatic program control for galvanizing timing management.

High waste acid treatment costs:Pickling generates large volumes of waste hydrochloric acid – expensive off-site treatment with environmental risks. Root cause: lack of waste acid regeneration and resource recovery systems.

3. Solution

3.1 High-Efficiency Natural Gas Heating System:High-speed pulse burners (TJ300×6 sets) – instantaneous gas consumption 420m³/h – dual main intake control (one active, one standby). Three-stage PLC temperature control – zinc bath temperature 438-450℃ automatically controlled – gas consumption approximately 12.5m³ per ton of parts at full load.

3.2 Cascade Flue Gas Waste Heat Utilization System (Patents):500℃ flue gas → stainless steel heat exchanger heats water to 90℃ → titanium alloy heat exchanger heats fluxing liquid to 50-70℃. 300℃ flue gas → drying tank heats workpieces. 200℃ flue gas → combustion air heat exchanger heats air to 50-150℃ – saves approximately 3m³ gas per ton of parts. Kettle edge waste heat (~200℃) → stainless steel double-layer coil heats water for acid heating / space heating. Final flue gas → workshop heating. Comprehensive energy savings significant.

3.3 Enclosed Negative-Pressure Acid Mist Treatment System:Pickling tanks with enclosed acid mist treatment rooms – ground rail carts for material loading/unloading – negative pressure maintained at 5-10Pa – no acid mist escape. Acid mist passes through pre-treatment + absorption neutralization tower (automatic dosing, 45kW variable frequency fan, inlet/outlet pH probes) for compliant discharge. Rinse water reused for new acid preparation – reduces alkali usage. VFD fan automatically reduces frequency based on negative pressure setting – saves ~50% electricity.

3.4 Zinc Fume Collection & Purification System:Double-sided suction capture of zinc fume at kettle edges (or mobile cover type) – smoke suction + bag filter + induced draft fan + water curtain deodorization (chimney, ducts, etc.) – 160kW variable frequency – starts 2-3 minutes before kettle immersion – saves 200-300% power. High/low speed switching ensures bags are blown clean.

3.5 Automatic Iron Removal & pH Balance System:Fluxing liquid equipped with automatic iron removal equipment – ensures iron content ≤1mg/L, pH controlled around 5 – effectively reduces zinc consumption and improves coating quality.

3.6 Automated Galvanizing Control System:PLC automatic program design – crane automatically enters set zinc immersion time after lifting parts – zinc temperature automatically controlled – prevents manual over-immersion adding unnecessary zinc layers and costs.

3.7 Waste Acid Regeneration System (Optional):Sulfuric acid displacement method – waste hydrochloric acid processed to recover regenerated acid (concentration 15-22%) for production reuse – byproduct ferrous sulfate monohydrate for resource recovery – zero pollution, zero discharge, full recovery, full utilization. Annual waste acid treatment 3,000 tons – annual net profit ~RMB 2.15 million – payback period ~3 months.

4. Technical Specifications

Parameter Specification
Zinc kettle internal size (L×W×H) 13×1.5×3.5 m
Zinc capacity 420 tons
Maximum hourly capacity 18 tons/hour
Heating energy Natural gas, calorific value 8400-8600×4.18kJ/m³
Gas inlet pressure 100-200 kPa
Burner configuration High-speed pulse TJ300×6 sets, 420m³/h instantaneous
Full load gas consumption ~12.5m³/ton of parts
Zinc bath temperature 438 – 450℃ (auto-controlled)
Fluxing liquid temperature 50 – 70℃
Power supply 380V/50Hz
Total electrical consumption ~530kW
Pickling room Enclosed negative pressure (5-10Pa), ground rail cart loading
Acid mist treatment Pre-treatment + neutralization tower, auto-dosing, 45kW VFD
Zinc fume treatment Double-sided capture + bag filter + water curtain deodorization, 160kW VFD
Fluxing iron removal Auto iron removal, iron ≤1mg/L, pH≈5
Control method PLC automatic program + manual
Total equipment weight ~159 tons
Shipping configuration 6×40HQ + 1×20GP containers

5. Selection Guide

5.1 Recommended Scenarios

  • High-volume galvanizing of large steel structural parts (transmission towers, bridge components, steel gratings, etc.)

  • New construction or upgrade of large-scale galvanizing lines requiring environmental compliance

  • Energy-saving galvanizing plants seeking natural gas consumption reduction and waste heat utilization

5.2 Key Selection Considerations

  1. Kettle size and capacity: Verify 13×1.5×3.5m kettle and 18 tons/hour capacity meet production needs

  2. Fuel conditions: User to supply natural gas with calorific value ≥8400×4.18kJ/m³, pressure 100-200kPa

  3. Power supply: User to supply 380V/50Hz 3-phase power, total capacity ~530kW

  4. Facility conditions: User responsible for building, concrete tank construction, foundations, water/electricity/gas lines to equipment interface

  5. Lifting equipment: User to supply hoists and cranes (5-ton + 5-ton units)

  6. Environmental requirements: Acid mist and zinc fume treatment systems meet local emission standards

  7. Waste acid treatment: Recommend optional waste acid regeneration system – zero discharge and cost savings

6. FAQ

Q1: How much natural gas can the waste heat utilization system save?

A: Combustion air heating system heats air to 50-150℃ – saves approximately 3m³ gas per ton of parts. Combined with fluxing heating, workpiece drying, kettle edge heat recovery, and workshop heating – annual gas savings of hundreds of thousands RMB – significant comprehensive energy savings.

Q2: How is acid mist emission compliance ensured?

A: Enclosed negative-pressure pickling room (5-10Pa) with ground rail cart operation – prevents acid mist escape. Acid mist passes through pre-treatment then absorption neutralization tower with automatic dosing – inlet/outlet pH probes – 45kW VFD fan automatically adjusts frequency based on negative pressure – saves ~50% power – ensures compliant discharge.

Q3: How does the zinc fume treatment system work?

A: Double-sided suction captures zinc fume at kettle edges – smoke passes through bag filter for dust removal – then water curtain deodorization tower – finally discharged via chimney. 160kW VFD fan starts 2-3 minutes before kettle immersion – saves 200-300% power. High/low speed switching ensures bags are blown clean.

Q4: How is fluxing liquid iron content controlled?

A: Automatic iron removal equipment continuously circulates and removes iron – ensures iron content ≤1mg/L – pH automatically regulated to ~5. Low iron content effectively reduces zinc consumption, minimizes zinc dross generation, and improves coating surface quality.

Q5: How does the waste acid regeneration system work?

A: Sulfuric acid displacement method – waste hydrochloric acid undergoes freeze crystallization to separate ferrous chloride – concentrated sulfuric acid added to displace ferrous sulfate and hydrogen chloride gas – HCl gas dissolves in dilute acid to produce regenerated acid (concentration 15-22%) for reuse in pickling – ferrous sulfate crystallized and sold as byproduct. Zero discharge, full recovery – annual treatment 3,000 tons – annual net profit ~RMB 2.15 million – payback ~3 months.