| Brand Name: | WONDERY |
| Model Number: | 60600 |
| MOQ: | 1SET |
| Price: | TO BE NEGOTIATED |
| Delivery Time: | 120 WORKING DAYS |
| Payment Terms: | L/C, D/P, T/T, Western Union |
HB-250×150-4.7M | 1150℃ Continuous High Temperature Mesh Belt Brazing Furnace | Metal Parts & Stainless Steel Bright Heat Treatment System
I. Product Overview
WUXI WONDERY INDUSTRY EQUIPMENT CO., LTD. proudly presents the HB-250×150-4.7M, a top-tier Continuous High-Temperature Brazing Furnace. Engineered with a 250mm wide heavy-duty mesh belt and a 4.7-meter-long muffle heating tunnel, this system reaches a maximum operating temperature of 1150°C. It is meticulously designed for high-quality protective atmosphere brazing, bright hardening, and annealing processing of automotive components, mechanical hardware, and electronic copper/stainless steel assemblies.
Problem: Low Joint Strength, Voiding, and Leakage at Brazed Areas.
Cause: Coarse Multi-Zone Temperature Profiles. At the critical 1100°C brazing stage, any dynamic thermal drifting or sluggish PID feedback will fail to melt the brazing alloy uniformly, yielding weak joints.Problem: Surface Oxidation, Scaling, and Discoloration post Heat Treatment.
Cause: Atmosphere Infiltration & Poor Muffle Sealing. Micro-cracks or loose seals in the furnace envelope under cyclic thermal stress allow oxygen to leak into the protective environment, compromising the "bright" mirror finish.Problem: Chronic Sagging, Cracking, and Thermal Creep of the Muffle and Belts.
Cause: Substandard Steel Grade and Wall Thickness under Persistent Stress. Standard heat-resistant metals fatigue quickly above 1000°C, precipitating costly muffle collapse and sudden line stoppages.Extreme 1150°C Limit & 4-Zone Precise Tuning: Driven by 48 premium Silicon Carbide Rods arranged across 4 separate heating zones, the normal 1100°C continuous running range is tracked meticulously for exceptional thermal stability.
Thick SUS310S Premium Heat-Resistant Muffle: The massive 300×170mm cross-section muffle is constructed from high-purity SUS310S stainless steel (thickness ≥8mm), delivering excellent creep defense.
Variable Speed Heavy Duty Belt Drive: Outfitted with a high-strength Φ3×Φ4mm heat-resistant mesh wire, running on a stable variable frequency drive adjustable between 80-400 mm/min to match varied batch heating curves.
High-Volume Multi-Stage Jacket Cooling: The cooling exit chamber relies on an active water jacket handling 10 tons per hour, marrying natural water tank loops and cooling tower circuits for a perfect bright finish.
| Category | Item | Technical Specification |
| Model | Model Designation | HB-250×150-4.7M |
| Dimensions | Effective Work Dimensions (W × H) | 250 × 150 mm |
| Muffle Cross-Section / Thickness | 300 × 170 mm | Thickness ≥ 8 mm (SUS310S) | |
| Total Muffle Tunnel Length | 4700 mm | |
| Power | Rated Heating Capacity | 130 ± 10% kW (Max Customer Utility Consumption: 170KW) |
| Power Line Configuration | 380 V, 3-Phase, 50 Hz | |
| Temperature Control Zones | 4 Independent Heating Zones | |
| Temperature | Maximum Rated Temperature | 1150 ℃ |
| Common Continuous Operating Temp | 1100 ℃ (Continuously Adjustable & Controllable) | |
| Protective Atmosphere Gas | Provided by Customer (Supports Reducing/Inert Gas) | |
| Drive & Parts | Primary Heating Elements | Silicon Carbide (SiC) Rods, 48 pieces total |
| Mesh Belt Geometry & Weave | 250 mm Width | Φ3 × Φ4 mm High-Temp Wire Mesh | |
| Conveyor Transport Speed | 80 - 400 mm/min (VFD Stepless Adjustment) | |
| Embedded Auxiliary Controls | Chint Low-Voltage Systems | 4 Sets F10 Flowmeters | S-Type Thermocouples |
Cross-Check Part Geometries: The precise clearance threshold of this unit is 250mm width by 150mm height. Confirm that your components—along with any transport racks or carbon fixtures—fit comfortably within this envelope to avoid catastrophic muffle collisions.
Facility Facility Compliance: Your plant's power grid must be certified to support up to 170KW of total equipment load. Concurrently, a water cooling tower with a continuous delivery rating of 10 tons/hour must be pre-arranged.
Floor Micro-Climate Planning: Position the furnace layout away from primary loading bay doors or open facility windows. Air cross-drafts from ventilation fans near the entry or exit can disturb the delicate internal nitrogen-hydrogen gas blanket.
Q: Are on-site utility wiring and interconnecting manifolds included?
A: Yes. According to our engineering turnkey agreement, Wondery provides all primary interconnecting cables for the equipment modules. Furthermore, we supervise and handle the piping installation for both the internal water cooling and gas delivery manifolds.Q: How long is the production lead time and when does the pricing expire?
A: The manufacturing cycle is highly optimized at 60 working days following the receipt of the initial down payment. This comprehensive technical proposal and pricing remain fully valid until June 25, 2026.