WDL-BL-9000 Gas-Fired Aluminum Ladle with Heating Cover – Degassing Function and 9000 kg Capacity Configuration Analysis

WDL-BL-9000 Gas-Fired Aluminum Ladle with Heating Cover – Degassing Function and 9000 kg Capacity Configuration Analysis

2026-11-24

I. Project Background and Equipment Process Positioning

    This case study involves a gas-fired aluminum ladle with a heating cover, model WDL-BL-9000, equipped with a refining and degassing function for the transfer and holding of molten aluminum alloy. The equipment is designed for a molten aluminum load of no less than 9000 kilograms. The furnace body features a steel structure shell formed by splicing and welding steel plates and shaped steel, with a one-time cast lining. The castable material offers high strength and long service life, suitable for long-term high-temperature aluminum melt operating conditions.

 

II. Matching Relationship Between Equipment Dimensions and Load Capacity

      The overall external dimensions are 3000 mm in length, 2900 mm in width, and 3016 mm in height, with a total height of 5220 mm at maximum tilting angle. The main body is a cylindrical structure with a diameter of 2523 mm. These dimensions correspond to the aluminum melt load of no less than 9000 kilograms – the thickness of the castable lining and the rigidity of the steel shell jointly ensure structural stability during transfer of the large-capacity melt. Installation requires reserved space for the furnace body tilting travel, and the 5220 mm tilt-limit height is a constraint for workshop clearance and lifting path planning.

 

III. Combustion System and Safety Interlock Configuration

     The combustion system is equipped with one short-flame burner. The natural gas interface is DN25, with an inlet pressure range of 10 to 90 kPa, a maximum flow of 25 Nm³/h, and a combustion power of 230 kW. The system startup sequence is as follows: the fan is started first, then the heating switch is engaged. The system automatically executes a purging procedure lasting approximately 20 seconds. After purging, the slow-opening gas valve opens. The burner controller continuously collects flame signals and switches to normal combustion mode once a stable flame signal is detected. The system has a flameout protection safety interlock function – if the flame signal is lost during operation, the burner controller immediately triggers a protection action, cutting off the gas supply and simultaneously closing the slow-opening gas valve to stop combustion. Restarting requires resetting and re-executing the entire purging and ignition process. Fan failure or abnormal air pressure also triggers the interlock protection, preventing the gas valve from opening to avoid gas leakage and accumulation.

 

IV. Hydraulic Tilting and Mechanical Synchronization Configuration

        The hydraulic system employs a dual hydraulic cylinder design with a mechanical synchronization valve and a self-locking function to ensure stable and reliable tilting operation. Limit switches are installed on the furnace body tilting mechanism to control the tilting angle. The dual-cylinder plus mechanical synchronization valve configuration addresses the need for balanced force on both sides during tilting discharge of a large-capacity ladle – a single hydraulic cylinder under eccentric load tends to cause torsion, while dual-cylinder synchronization reduces additional stress on the furnace body frame. The hydraulic station power is 5.5 kW.

 

V. Electrical Configuration and Power Distribution

     The power supply is 380V AC three-phase five-wire 50Hz, with a total power consumption of 6.5 kW, of which the hydraulic station accounts for 5.5 kW and the combustion fan 0.85 kW. Main components include a DN25 pressure reducing valve, DN25 slow-opening solenoid valve, ignition transformer, ignition controller, pressure switches, and a 230 kW burner tip. Low-voltage electrical components are from Chint, while combustion control-related components are international brands. The standard supply scope includes the furnace body, control box, hydraulic station, and Chinese instruction manual and electrical schematic diagram.

 

VI. Wear Parts and Maintenance Cycle

       Wear parts include the fan filter, ignition transformer, ignition controller, gas slow-opening valve, and ignition electrode. The recommended replacement cycle for the fan filter and ignition electrode is no less than 3 months, and for the ignition transformer, ignition controller, and gas slow-opening valve, no less than 12 months.

Latest company case about
Solutions Details
Created with Pixso. Home Created with Pixso. solutions Created with Pixso.

WDL-BL-9000 Gas-Fired Aluminum Ladle with Heating Cover – Degassing Function and 9000 kg Capacity Configuration Analysis

WDL-BL-9000 Gas-Fired Aluminum Ladle with Heating Cover – Degassing Function and 9000 kg Capacity Configuration Analysis

I. Project Background and Equipment Process Positioning

    This case study involves a gas-fired aluminum ladle with a heating cover, model WDL-BL-9000, equipped with a refining and degassing function for the transfer and holding of molten aluminum alloy. The equipment is designed for a molten aluminum load of no less than 9000 kilograms. The furnace body features a steel structure shell formed by splicing and welding steel plates and shaped steel, with a one-time cast lining. The castable material offers high strength and long service life, suitable for long-term high-temperature aluminum melt operating conditions.

 

II. Matching Relationship Between Equipment Dimensions and Load Capacity

      The overall external dimensions are 3000 mm in length, 2900 mm in width, and 3016 mm in height, with a total height of 5220 mm at maximum tilting angle. The main body is a cylindrical structure with a diameter of 2523 mm. These dimensions correspond to the aluminum melt load of no less than 9000 kilograms – the thickness of the castable lining and the rigidity of the steel shell jointly ensure structural stability during transfer of the large-capacity melt. Installation requires reserved space for the furnace body tilting travel, and the 5220 mm tilt-limit height is a constraint for workshop clearance and lifting path planning.

 

III. Combustion System and Safety Interlock Configuration

     The combustion system is equipped with one short-flame burner. The natural gas interface is DN25, with an inlet pressure range of 10 to 90 kPa, a maximum flow of 25 Nm³/h, and a combustion power of 230 kW. The system startup sequence is as follows: the fan is started first, then the heating switch is engaged. The system automatically executes a purging procedure lasting approximately 20 seconds. After purging, the slow-opening gas valve opens. The burner controller continuously collects flame signals and switches to normal combustion mode once a stable flame signal is detected. The system has a flameout protection safety interlock function – if the flame signal is lost during operation, the burner controller immediately triggers a protection action, cutting off the gas supply and simultaneously closing the slow-opening gas valve to stop combustion. Restarting requires resetting and re-executing the entire purging and ignition process. Fan failure or abnormal air pressure also triggers the interlock protection, preventing the gas valve from opening to avoid gas leakage and accumulation.

 

IV. Hydraulic Tilting and Mechanical Synchronization Configuration

        The hydraulic system employs a dual hydraulic cylinder design with a mechanical synchronization valve and a self-locking function to ensure stable and reliable tilting operation. Limit switches are installed on the furnace body tilting mechanism to control the tilting angle. The dual-cylinder plus mechanical synchronization valve configuration addresses the need for balanced force on both sides during tilting discharge of a large-capacity ladle – a single hydraulic cylinder under eccentric load tends to cause torsion, while dual-cylinder synchronization reduces additional stress on the furnace body frame. The hydraulic station power is 5.5 kW.

 

V. Electrical Configuration and Power Distribution

     The power supply is 380V AC three-phase five-wire 50Hz, with a total power consumption of 6.5 kW, of which the hydraulic station accounts for 5.5 kW and the combustion fan 0.85 kW. Main components include a DN25 pressure reducing valve, DN25 slow-opening solenoid valve, ignition transformer, ignition controller, pressure switches, and a 230 kW burner tip. Low-voltage electrical components are from Chint, while combustion control-related components are international brands. The standard supply scope includes the furnace body, control box, hydraulic station, and Chinese instruction manual and electrical schematic diagram.

 

VI. Wear Parts and Maintenance Cycle

       Wear parts include the fan filter, ignition transformer, ignition controller, gas slow-opening valve, and ignition electrode. The recommended replacement cycle for the fan filter and ignition electrode is no less than 3 months, and for the ignition transformer, ignition controller, and gas slow-opening valve, no less than 12 months.